800 sq ft Detached ADU in Encino
- Paid
- $268,000
- Took
- 11 months, design to final inspection
- Size
- 800 sq ft, 2 bed / 1 bath
Kitchen Remodel with Load-Bearing Wall Removal, Sherman Oaks
- Paid
- $94,000
- Took
- 9 weeks of construction
- Size
- 310 sq ft kitchen, opened to dining and living
Primary Bath Suite in a 1912 Pasadena Craftsman
- Paid
- $52,000
- Took
- 5 weeks of construction
- Size
- 115 sq ft, curbless shower and freestanding tub
Second-Story Addition in Burbank
- Paid
- $412,000
- Took
- 10 months including permitting
- Size
- 1,050 sq ft added, 2 bed / 2 bath upstairs
Hillside Foundation Repair and Seismic Retrofit, Silver Lake
- Paid
- $178,000
- Took
- 4 months
- Size
- 1,600 sq ft home on a steep downslope lot
Garage Conversion to Permitted ADU, Woodland Hills
- Paid
- $118,000
- Took
- 7 months including permitting
- Size
- 440 sq ft, 1 bed / 1 bath
Whole-Home Remodel of a 1920s Santa Monica Bungalow
- Paid
- $585,000
- Took
- 13 months including design and permitting
- Size
- 1,900 sq ft, full gut renovation
New 4,800 sq ft Custom Home on a Calabasas Hillside
- Paid
- $3.1 million
- Took
- 26 months including entitlement
- Size
- 4,800 sq ft, 5 bed / 5.5 bath
Whole-Home Remodel on a Manhattan Beach Walk Street
- Paid
- $640,000
- Took
- 12 months including permitting
- Size
- 2,150 sq ft on a 30 ft wide lot
Family Room and Bath Addition in Glendale
- Paid
- $186,000
- Took
- 6 months including permitting
- Size
- 520 sq ft added, family room plus full bath
Soft-Story Seismic Retrofit of a Long Beach Fourplex
- Paid
- $142,000
- Took
- 3 months
- Size
- 4 units over tuck-under parking
Mid-Century Kitchen Remodel in Studio City
- Paid
- $108,000
- Took
- 10 weeks of construction
- Size
- 285 sq ft kitchen in a post-and-beam home
1,000 sq ft Detached ADU in Northridge
- Paid
- $295,000
- Took
- 10 months, design to final inspection
- Size
- 1,000 sq ft, 2 bed / 2 bath
SB9 Lot Split with Two New Homes, Highland Park
- Paid
- $1.24 million
- Took
- 22 months including the split and both builds
- Size
- Two homes, 1,150 sq ft each
Attached Garage Converted to a Studio ADU, Torrance
- Paid
- $96,000
- Took
- 6 months including permitting
- Size
- 380 sq ft studio with a full bath
Cantilevered Addition on Caissons, Hollywood Hills
- Paid
- $720,000
- Took
- 18 months including hillside review
- Size
- 900 sq ft added plus a 600 sq ft deck
Two Guest Bath Remodels in a Culver City Traditional
- Paid
- $61,000
- Took
- 6 weeks of construction
- Size
- Two bathrooms, 60 sq ft and 45 sq ft
New Custom Coastal Home in Pacific Palisades
- Paid
- $4.2 million
- Took
- 28 months including entitlement
- Size
- 5,200 sq ft, 5 bed / 6 bath
Fire Rebuild on Wheeler Ave, Sylmar
- Paid
- $486,000
- Took
- 14 months including insurance scope and permitting
- Size
- 1,650 sq ft, 3 bed / 2 bath rebuilt
Foundation Replacement Under a 1920s Duplex, Beverly Grove
- Paid
- $132,000
- Took
- 3.5 months
- Size
- 2,400 sq ft duplex, full perimeter foundation
Garage Conversion ADU on Forbes Ave, North Hills
- Paid
- $112,000
- Took
- 6 months including permitting
- Size
- 420 sq ft, 1 bed / 1 bath
Kitchen Remodel on Florentina Ave, Alhambra
- Paid
- $72,000
- Took
- 8 weeks of construction
- Size
- 220 sq ft kitchen in a 1940s home
Primary Bathroom Remodel on Cass Ave, Woodland Hills
- Paid
- $48,000
- Took
- 5 weeks of construction
- Size
- 95 sq ft primary bath, walk-in shower
Room Addition on El Rodeo Rd, Rancho Palos Verdes
- Paid
- $224,000
- Took
- 8 months including permitting
- Size
- 540 sq ft added, family room plus bedroom
Garage Conversion on S Dalton Ave, Gardena
- Paid
- $89,000
- Took
- 5 months including permitting
- Size
- 400 sq ft studio ADU with full bath
Kitchen Remodel on Flint Ave, Long Beach
- Paid
- $66,000
- Took
- 7 weeks of construction
- Size
- 190 sq ft kitchen in a 1920s Spanish bungalow
Complete Home Remodel on Ferrara Ln, Porter Ranch
- Paid
- $395,000
- Took
- 10 months including permitting
- Size
- 2,600 sq ft two-story, full interior renovation
Family Room Addition on Firebird Ave, Whittier
- Paid
- $158,000
- Took
- 6 months including permitting
- Size
- 460 sq ft family room addition
Detached ADU on Louvre St, Pacoima
- Paid
- $205,000
- Took
- 9 months, design to final inspection
- Size
- 600 sq ft, 1 bed / 1 bath
Hall Bathroom Remodel on W 118th St, Hawthorne
- Paid
- $34,000
- Took
- 4 weeks of construction
- Size
- 50 sq ft hall bathroom