- Typical cost
- From $18,000 (guest bath), $28,000 (mid-range), $58,000+ (master suite)
- Typical timeline
- 3–5 weeks of construction
- Permits through
- LADBS
- Service area
- Mar Vista, Westside
What We Do
Full gut renovations, primary bath suites, guest baths and powder rooms. We do the waterproofing ourselves and don't hide it behind someone else's schedule.
- Curbless and custom tile showers
- Freestanding and drop-in tubs
- Custom vanities and storage
- Heated floors and niche lighting
- Full waterproofing assemblies
- Exhaust ventilation sized to the room
Bathroom Remodeling Conditions in Mar Vista
Lots are flat and generous enough that detached ADUs work here, and rear-yard access is usually workable. On post-and-beam homes, replacing glass and doors calls for attention to the structural grid, and roof and beam repairs show up more often than owners expect. Marine air means corrosion-resistant hardware and flashing.
- Late 1940s and 1950s post-and-beam and midcentury tract homes
- Single-pane glass and wall assemblies with little insulation
- Flat lots that support a detached ADU with rear access
- Beam, roof and skylight repairs common on post-and-beam roofs
- Marine air, so corrosion-resistant hardware and flashing
The Part Nobody Sees
Waterproofing is the single most important part of a bathroom, and it's the first thing a cheap bid cuts. We install a complete waterproofing assembly behind the tile, slope the pan correctly, and pressure-test before anything gets covered up.
- Sheet or liquid membrane behind all wet walls
- Properly sloped, tested shower pans
- Backer board instead of drywall in wet areas
- Sealed penetrations at valves and drains
Permits and Timeline
Relocating fixtures or adding circuits needs a permit. Most bathrooms run 3 to 5 weeks of construction once materials are on site. The schedule slips when tile and fixtures are ordered late, so we lock selections before demo.
- Plumbing and electrical permits through LADBS
- Selections finalized before demolition
- Daily photo updates in your client portal
FREQUENTLY ASKED QUESTIONS
Do you do bathroom remodeling in Mar Vista?
Yes. Mar Vista is part of our regular service area. We'll come out for a free on-site consultation, walk the property, and tell you what's realistic before you spend anything on design.
What does bathroom remodeling cost in Mar Vista?
From $18,000 (guest bath), $28,000 (mid-range), $58,000+ (master suite). Site conditions in Mar Vista and your material selections move the number, which is why we price after walking the property rather than over the phone.
Who issues the permit in Mar Vista?
Permits for this work go through LADBS. We handle the submittal, plan check corrections and inspections as part of the project.
How much does a bathroom remodel cost in Los Angeles?
Bathroom remodels in LA start at $18,000 for a guest bath, $28,000 for a mid-range full remodel, and $58,000 and up for a master suite, depending on size, whether fixtures move, and the tile and fixture selections.
How long does a bathroom remodel take?
Typically 3 to 5 weeks of construction once materials are on site, assuming no surprises behind the walls in an older LA home.
Do you handle waterproofing yourselves?
Yes. Our own crews install the waterproofing assembly and we test the shower pan before tile goes on. It's the most common failure point in a bathroom and we don't subcontract it out.
Do you handle walk-in shower conversions and small bathroom remodels near me?
Yes. Curbless and walk-in shower conversions, powder room updates and small bathroom renovations are some of our most common projects. Homeowners searching for bathroom renovation contractors near me hire us across LA County and neighboring cities within about 100 miles of Woodland Hills.
Similar Projects We've Built

Primary Bath Suite in a 1912 Pasadena Craftsman
A gut renovation of an original bathroom in a historic Craftsman, with a curbless shower, heated floors and period-appropriate fixtures.

Two Guest Bath Remodels in a Culver City Traditional
Both original 1946 bathrooms in a Culver City traditional gutted and rebuilt at the same time, with new supply and drain lines.

Primary Bathroom Remodel on Cass Ave, Woodland Hills
On Cass Ave in Woodland Hills, a cramped 1960s primary bathroom was gutted and rebuilt with a large walk-in shower, double vanity and new plumbing.
DISCUSS YOUR PROJECT WITH 1 SMART BUILD
Licensed, bonded and insured design-build general contractor serving Los Angeles County and Southern California. Tell us about your property and goals, and we'll walk you through feasibility, permitting and a clear plan.
